DECATUR, GA–Eastside Drive, between Pleasant Wood Drive and Wesley Chapel Road, will be closed to through-traffic from 7 a.m. Monday, Sept. 27, to 7 p.m. Friday, Oct. 20, to facilitate the repair of a 24-inch natural gas transmission pipeline between 4205 and 4265 Eastside Drive, Decatur, GA 30034.